Underground fix yields aboveground results

Walton sewer repair cuts wastewater flow; pool upgrade planned post-fair

Posted 6/5/25

WALTON — A recent repair to a key section of the village sewer system has led to a noticeable drop in wastewater flow to the treatment plant, Delaware Engineering’s Bill Brown told Walton …

This item is available in full to subscribers.

Please log in to continue

Log in